City Mine(d) – PUM collectif
Proper Water | Eau Propre
05.05.12  ::  15-18:00  ::  Friche Eggevoort

First step in the project: preparing and activating filters for future rain water purification. And also: talking about 3 weeks of the Proper Water Pavillion [15.06.12 – 07.07.12]

Eerste stap in het project: filters activeren voor toekomstige regenwaterzuivering.
En ook: babbelen over 3 weken Proper Water Paviljoen [15.06.12 – 07.07.12]

Premier pas dans le projet: préparer les filtres pour la future purification d’eau de pluie.
Et aussi: parler des 3 semaines de Pavillon d’Eau Propre [15.06.12 – 07.07.12]

Friche Eggevoort
av du Maelbeek laan – arrêt bus stop Senghor
1040 Etterbeek
 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s